Metal Garden Shed with Internal Base Size (Grey Width 7Ft 9" by Depth 9Ft 11")
dirty pro tools
free shipping
To the product (1 offer)
9,4
Show on Amazon
6
BIRCHTREE Garden Shed Steel Apex Roof House Outdoor Backyard Storage With Lockable Double Doors Window Free Foundation Tool Equipment Organizer Air Vents 10x10FT Grey
BIRCHTREE
free shipping
To the product (1 offer)
9,4
Show on Amazon
7
Panana Metal Garden Shed Storage Sheds Heavy Duty Outdoor FREE Base Foundation Green/Grey Color (10x8 Grey)
Panana
5% off
free shipping
To the product (1 offer)
9,4
Show on Amazon
8
Aoxun 5x3 FT Outdoor Storage Shed with Floor, Plastic Garden Resin Shed for Patio, Lawn, Small Garden Shed Waterproof Plastic Tool Shed with Sloped Roof for Bike, Garbage Can, Tools, Grey
Aoxun
15% off
free shipping
To the product (1 offer)
9,4
Show on Amazon
9
UDPATIO Outdoor Storage Shed 8x8 FT, Outside Sheds & Outdoor Storage Metal Galvanized Steel Yard, Patio, Lawn, Tool Shed with Lockable Door for Can, Bike, Lawnmower, Generator,Dark Grey
UDPATIO
free shipping
To the product (1 offer)
9,3
Show on Amazon
10
Garden Universe Plastic Garden Shed 5' 6" x 4' 5" Apex Roof Storage Box Grey Garden Shed with Floor Bike Storage Outdoor Storage Weather-Resistant Grey Garden Storage PS03
You might also be interested in these 9x9 garden shed.
GiantexUK 6x4FT/7x4FT/8x6FT/9x6FT/9x8FT/11x8FT Metal Garden Shed, Outdoor Galvanized Storage House with Vents & Lockable Sliding Doors, Slope Roof Utility Shed Building (8x6FT, 8 Vents)
General Storage Space: Discover an extensive storage space with our garden shed measuring 246 x 193 x 180 cm and offering a capacity of 7.5 m3. Ideal for storing your gardening tools, bikes, mowers, and more. The generous size and volume keep your equipment organized and easy to access.
£ 289.59
free shipping
To the product (1 offer)
COSTWAY 8 x 4ft/8 x 6ft/10 x 8ft Galvanized Metal Garden Shed with 2 Front Doors & Side Door, Safety Locks, Keys, Sloping Roof & Air Vents, Weatherproof Tool Storage Shed House (8x6ft, 235x174x197cm)
【Triple-door Access Design】 This outdoor storage shed features a convenient triple-door setup, including 121 cm front double doors and a 73 cm side single door, all equipped with stainless steel hinges for durability and smooth operation over time.
£ 269.95
free shipping
To the product (1 offer)
WALTONS | Wooden Corner Summerhouse | Shiplap Tongue & Groove | Garden Room | Flat Roof | Double Door | Outdoor Sun Room | 7ft 8ft 9ft | 10 Year Anti Rot Guarantee | (7ft x 7ft)
All Fixtures and Fittings Included: Our garden storage shed comes with all necessary fixtures and fittings supplied as standard. Comprehensive product instructions are included to help you install your new wooden building quickly and easily, ensuring a smooth and efficient assembly process from start to finish.
£ 779.99
free shipping
To the product (2 offers)
BillyOh Greenhouse Wooden Frame with Air Vent | Clear Wall Glazing | Cold Frame | Garden Plants | Outdoor Storage Shed Lincoln Green House (9 x 6)
WIDE OPENING DOUBLE DOORS: Provide you with easy in and out access to your garden greenhouse and ensure you can easily move larger plants and gardening equipment into your greenhouse.
£ 689.00
free shipping
To the product (1 offer)
Keter Manor Outdoor Apex Double Door Garden Storage Shed 6 x 8ft Beige Brown Wood effect | Fade Free | All Weather Resistant | Safe and Secure | Zero Maintenance | 15 year Warranty
Ideal outdoor storage solution for all garden tools and equipment, BBQ's, bicycles and DIY tools
£ 700.00
free shipping
To the product (3 offers)
Duramax ECO 10 x 10 (9.74 m2) Metal Garden Storage Shed, Hot-Dipped Galvanized Metal Garden Shed, Tool Storage Shed, Strong Reinforced Roof Structure, Maintenance-Free Metal Shed, Anthracite
All-weather resistant metal garden sheds – the duramax eco sheds are made of high-quality hot dipped galvanized steel which are resistant to harsh weather conditions and are durable, 20 thicker steel than conventional sheds
£ 456.26
free shipping
To the product (1 offer)
Total 7ft x 4ft Pent Garden Timber Shed
Total Sheds
£ 795.00
free shipping
To the product (1 offer)
Palram Canopia Yukon Shed With floor/Without floor (11x9)
THOUGHTFUL ENGINEERING THAT OFFERS YEAR ROUND PROTECTION - Virtually unbreakable polycarbonate panels block 100% of harmful UV rays while unique shingled roof transmits natural sunlight while remaining opaque in appearance.
£ 1,579.00
free shipping
To the product (1 offer)
11 x 9 COMBI Pressure Treated Tongue & Groove Pent Summerhouse with Side Shed + Lock & Key (11' x 9') / (11ft x 9ft) (11x9)
11 x 9 COMBI Pressure Treated Tongue & Groove Pent Summerhouse with Higher Eaves and Ridge Height + Side Shed + Euro Lock with Key (11ft x 9ft) / (11' x 9')
£ 4,022.36
free shipping
To the product (1 offer)
Wooden Garden Shed and Log shed, 19 mm planks - Sheds and Outdoor Storage - Wooden Shed 9 ft x 7 ft x H7 ft /4.47 m2 (2 m3 capacity), Bike storage, Waterproof roof - TIMBELA M386C
WOODEN LOG SHELTER WITH STORAGE – Garden log store and storage shed with integrated firewood shelter offering approximately 4.47 m2 of floor area. Designed to fit against fences, walls, or beneath overhangs. Suitable for storing firewood and wheelie bins.
£ 997.00
free shipping
To the product (2 offers)
Amopatio Metal Garden Storage Shed 8x8 ft, Outdoor Tool Storage Shed 241x252x201 cm, BikeShed Waterproof with Lockable Door for Backyard, Patio, Garbage Bin, Tools, Black
【Spacious & Practical Storage】With dimensions of 241x252x201 cm (L x D x H) and a storage capacity of 5.5 m3, this garden storage shed offers ample space for bikes, chairs, tools, bins, trolleys, and even a charcoal grill. Its clean and practical design not only excels in storage but also adds a touch of style to your garden or backyard.
£ 259.99
free shipping
To the product (1 offer)
Metal Garden Shed with Internal Base Size (Grey Width 7Ft 9" by Depth 5Ft 9")
Please refer to Specification drawing For Dimensions - Dimensions: External: Width 236 x Depth 174 x Height 190cm - With a large product like this all dimension are approximate
£ 229.95
free shipping
To the product (1 offer)
Which.One Highlight
Lifetime 60310 Garden Storage Shed, 7 x 9.5 ft (213 x 289 cm), High-Density Polyethylene (HDPE), Steel-Reinforced Apex Roof, Tan